Skip to Content
  • Català English (UK) Español

  • Segueixi amb nosaltres
auma consulting
  • 0
    My Cart
  • 0
    Wishlist
  • Sign in
  • Solutions
  • Services
  • Practice areas
  • Markets
  • Academy
  • News
    • News
    • Success stories
  • About us
  • Help
  • Let's talk about your project
auma consulting
  • 0
  • 0
    • Solutions
    • Services
    • Practice areas
    • Markets
    • Academy
    • News
      • News
      • Success stories
    • About us
    • Help

  • Segueixi amb nosaltres
  • Català English (UK) Español
  • Sign in
  • Let's talk about your project

Environmental impact study for the permitting of a cement plant

An EIA supporting the integrated environmental permit of a cement works in Vallès, one of the most closely scrutinised industrial activities
  • All Blogs
  • Success stories
  • Environmental impact study for the permitting of a cement plant
  • 1 September 2026 by
    Environmental impact study for the permitting of a cement plant
    Marc Oliva Carbonell

    auma drafted theenvironmental impact study supporting theintegrated environmental permit of a cement plant in Vallès: an Annex I installation in a consolidated urban setting, where every emission parameter faces public scrutiny.

    Annex I
    installation category
    Urban setting
    site context
    EIA + permit
    combined process

    Project overview

    ClientConstruction materials manufacturer (confidential)
    MarketIndustry
    Practice areaEnvironment · Air quality
    LocationVallès Occidental (Spain)
    ServicesEnvironmental impact study for the permit
    Year2021

    The challenge

    Cement manufacturing is one of the hard-to-abate sectors and, at the same time, an activity with a strong territorial presence. Permitting reflects that:

    • Intensive process: high temperatures, heavy energy use and both fugitive and channelled emissions to control.
    • Urban proximity: the plant coexists with inhabited areas, which raises the bar on air quality and noise.
    • Strict sector benchmark: the industry has highly detailed best available techniques conclusions.

    The auma solution

    The EIA is built on rigorous characterisation of the real process, not theoretical values:

    • Characterisation of emission sources, consumption and environmental vectors from the plant's operating data.
    • Assessment of impacts on air quality, noise and surroundings, with particular attention to nearby residents.
    • Benchmarking of operations against the sector's best available techniques as the reference for permitting.

    The result

    • Environmental impact study delivered as the basis for the integrated permit process.
    • Documentation prepared to withstand technical scrutiny and the public consultation period.
    • A technical baseline on which the plant can plan future environmental and process improvements.
    For an Annex I activity with neighbours next door, the environmental assessment must not only be correct: it must be explainable to the people living there.

    Frequently asked questions

    Why does cement manufacturing need an integrated environmental permit?

    Because it is listed in Annex I of integrated pollution prevention and control legislation, given its energy use, air emissions and production capacity. The permit consolidates all environmental conditions into a single decision.

    What are best available techniques?

    The most effective and advanced techniques that are technically and economically viable for a sector, set out in European reference documents. They define associated emission levels that underpin the permit's limits.

    Why is cement hard to decarbonise?

    Because a large share of its emissions are process emissions: decarbonating the raw material releases CO₂ regardless of the fuel used. Reducing them therefore requires material changes, efficiency gains and, in the medium term, carbon capture.

    Do you operate an Annex I installation?

    We draft the environmental assessment and permitting documentation for the most demanding industrial activities.

    Let's talk about your project
    in Success stories
    # Air quality Environment Industry
    Environmental impact study for the permitting of a cement plant
    Marc Oliva Carbonell 1 September 2026
    Share this post
    Tags
    Air quality Environment Industry
    Facing an environmental or energy challenge?

    Behind every article there is a team applying this every day. Let's talk.

    Let's talk about your project See our 360° solutions →
    auma Consultants

    ENVIRONMENT & ENERGYEngineering purpose

    Environmental and energy consulting and engineering. Independent since 1993, we help industry, utilities, renewable developers and public administrations decide, permit and deliver with technical rigour.

    What we do
    • 360° solutions
    • Services
    • Markets
    • Practice areas
    • Academy
    • News
    • Success stories
    Company
    • About us
    • Work with us
    • Legal notice
    • Privacy policy
    • Ethics channel
    • Customer care
    Contact

    Carrer Nicaragua 137, office 14
    08029 Barcelona, Spain

    +34 933 63 30 08

    auma@auma.es

    Let's talk about your project
    Insights newsletter

    Regulation and trends in environment and energy, once a month.

    Thanks for subscribing!

    Subscribe
    Copyright © auma
    Català | English (UK) | Español
    Powered by Odoo

    We use cookies to provide you with a better user experience on this website. Cookie Policy

    Essentials only I agree