Skip to Content
  • Català English (UK) Español

auma
  • 0
    My Cart
  • 0
    Wishlist
  • Sign in
  • Solutions
  • Services
  • Practice areas
  • Markets
  • Academy
  • News
    • News
    • Success stories
  • About us
  • Help
  • Let's talk about your project
auma
  • 0
  • 0
    • Solutions
    • Services
    • Practice areas
    • Markets
    • Academy
    • News
      • News
      • Success stories
    • About us
    • Help

  • Català English (UK) Español
  • Sign in
  • Let's talk about your project

auma · Service catalogue

Environmental and energy consulting and engineering, service by service.

Filter by category or tag, or search directly. If your challenge is bigger than a single service, take a look at our 360° solutions.

All products

  • auma Consulting
  • auma Engineering
  • auma Academy
  • Integrated solutions · Full cycle
Sort By Sort By: Featured
Featured Newest Arrivals Name (A-Z) Price - Low to High Price - High to Low
[PLA.13] Climate change adaptation plans (corporate and municipal)

Climate change adaptation plans (corporate and municipal)

Climate change adaptation plans for companies and public bodies: prioritised adaptation measures, integration into asset management and planning, and monitoring aligned with ESRS E1. The preliminary climate risk analysis sits in DIA.08: do not duplicate amounts.
Billing basis: Milestone · €
[DIA.07] Decarbonisation analysis: reduction potential and MACC curve

Decarbonisation analysis: reduction potential and MACC curve

Analysis of decarbonisation potential: emissions baseline, identification and quantification of reduction measures, and a marginal abatement cost curve (MACC) to prioritise investments. Footprint calculation sits in DIA.02 and the action plan in PLA.12: do not duplicate amounts.
Billing basis: Milestone · €
[DIA.08] Physical climate risk and vulnerability analysis (IPCC scenarios)

Physical climate risk and vulnerability analysis (IPCC scenarios)

Scenario-based physical climate risk analysis (IPCC): exposure and vulnerability of assets, operations and supply chain, with a report aligned to the EU taxonomy (DNSH) and ESRS E1. The resulting adaptation plan sits in PLA.13: do not duplicate amounts.
Billing basis: Milestone · €
[DIA.09] Water footprint and water impact assessment (ISO 14046)

Water footprint and water impact assessment (ISO 14046)

Product, process and organisational water footprint under ISO 14046, with scarcity (AWARE) and quality degradation impact assessment, and preparation of the water indicator for ESRS E3.
Billing basis: Milestone
[DIA.10] Water audit and water use efficiency

Water audit and water use efficiency

Audit of water use across facilities and networks: water balance, accounting by use, leak detection and a portfolio of saving, reuse and recirculation measures with the associated financial and energy savings.
Billing basis: Milestone
[DIA.11] Asset water risk and water stress analysis

Asset water risk and water stress analysis

Assessment of physical, regulatory and reputational water risk across the asset portfolio: exposure to water stress and drought under climate scenarios, dependence on abstraction rights, and a prioritised mitigation plan.
Billing basis: Milestone
[PLA.14] Water resilience and drought management plan

Water resilience and drought management plan

Water resilience plan for municipalities, business parks and industrial sites: availability scenarios, drought thresholds and stages, saving measures and alternative resources, and an activation and governance protocol.
Billing basis: Milestone
[PLA.15] Water supply and sanitation master plan

Water supply and sanitation master plan

Water supply and sanitation master plan: network assessment and hydraulic performance, demand and flow projections, prioritised portfolio of works, investment programme and alignment with urban planning.
Billing basis: Milestone
[PLA.16] Corporate water strategy and water stewardship

Corporate water strategy and water stewardship

Corporate water strategy: reduction targets and basin context, water stewardship roadmap (AWS), CDP Water response, and alignment with the EU taxonomy and ESRS E3.
Billing basis: Milestone
[PRO.28] Hydrogeology and groundwater: abstraction and protection zones

Hydrogeology and groundwater: abstraction and protection zones

Hydrogeological studies for abstraction points and groundwater bodies: aquifer characterisation, pumping tests, flow and transport modelling, protection zones and piezometric monitoring.
Billing basis: Milestone
[PRO.29] Sustainable urban drainage (SuDS), stormwater and combined sewer overflows

Sustainable urban drainage (SuDS), stormwater and combined sewer overflows

Sustainable urban drainage studies and designs: network and combined sewer overflow modelling, sizing of SuDS and attenuation, and integration with planning and public space.
Billing basis: Milestone
[DIA.12] Identification of measures eligible for energy saving certificates

Identification of measures eligible for energy saving certificates

Screening of energy saving measures that can generate certificates, with an estimate of the savings and the value of the certificates.
Billing basis: Fixed price · €
[TRA.09] Processing and monetisation of energy saving certificates

Processing and monetisation of energy saving certificates

Full processing of the energy saving certificate file with the delegated body, and support in monetising the certificates.
Billing basis: Mixed (milestone + success fee) · €
[PRO.30] Acoustic impact study

Acoustic impact study

Modelling and assessment of the acoustic impact of activities and infrastructure: background noise measurements, calculation of received levels, noise maps and mitigation measures, in line with Spanish national and regional noise legislation.
Billing basis: Milestone · €
[PRO.31] Air pollutant dispersion study

Air pollutant dispersion study

Modelling of atmospheric emissions dispersion (AERMOD and equivalents): inventory of sources, calculation of ground-level concentrations, comparison with air quality limit values and definition of mitigation measures.
Billing basis: Milestone · €
[PRO.32] Odour dispersion study

Odour dispersion study

Characterisation and modelling of odour dispersion: determination of odour concentration at source, modelling of exposure, assessment of impact on neighbours and minimisation measures.
Billing basis: Milestone · €
[PLA.17] Municipal general urban plan

Municipal general urban plan

Full drafting of the municipal general plan: preliminary version, initial, provisional and final approval. Includes the report, planning regulations, delivery schedule and economic and financial assessment, plus coordination of the strategic environmental assessment. Articles 57 et seq. of the Catalan planning act (DL 1/2010).
Billing basis: Milestone · €
[PLA.18] Review of the municipal general plan

Review of the municipal general plan

Review of the general plan in force, whether because the model is exhausted, circumstances have changed or legislation requires it, with a prior assessment of the current plan and a new land use arrangement. Articles 57 and 95 of the Catalan planning act (DL 1/2010).
Billing basis: Milestone · €
[PLA.19] Specific amendment of the general plan

Specific amendment of the general plan

Amendment of a specific provision of the general plan: change of land use category, adjustment of public systems, increase in buildable area or a new use. Includes justification of the public interest and, where applicable, a simplified strategic environmental assessment. Articles 96 et seq. of the Catalan planning act (DL 1/2010).
Billing basis: Milestone · €
[PLA.20] Simplified municipal general plan

Simplified municipal general plan

General plan for small municipalities or those with limited planning complexity, with a reduced documentary scope. Article 57.3 of the Catalan planning act (DL 1/2010).
Billing basis: Milestone · €
[PLA.21] Municipal urban development programme

Municipal urban development programme

Programming of the municipality's development works and land and housing policy, defining priorities, timescales and delivery measures. Articles 60 et seq. of the Catalan planning act (DL 1/2010).
Billing basis: Milestone · €
  • 1
  • 2
  • 3
  • 4
  • 5

Clear Filters
Not sure where to start?

Tell us about your case and we will propose the service or the 360° solution that fits best.

Let's talk about your project Book a meeting
auma Consultants

ENVIRONMENT & ENERGYEngineering purpose

Environmental and energy consulting and engineering. Independent since 1993, we help industry, utilities, renewable developers and public administrations decide, permit and deliver with technical rigour.

What we do
  • 360° solutions
  • Services
  • Markets
  • Practice areas
  • Academy
  • News
  • Success stories
Company
  • About us
  • Work with us
  • Legal notice
  • Privacy policy
  • Ethics channel
  • Customer care
Contact

Carrer Nicaragua 137, office 14
08029 Barcelona, Spain

+34 933 63 30 08

auma@auma.es

Let's talk about your project
Insights newsletter

Regulation and trends in environment and energy, once a month.

Thanks for subscribing!

Subscribe
Copyright © auma
Català | English (UK) | Español
Powered by Odoo

We use cookies to provide you with a better user experience on this website. Cookie Policy

Essentials only I agree